Box 2

 Container

Contains 6 Results:

A61-71, A73-81, 1975

 File — Box: 2, Folder: 1
Scope and Contents A61 Report #9; A62 Comprehensive Review Study – Tocks Island Lake; A63 Radio Programs on Tocks Island Correspondence between Stewart K Wright & Thomas O’Neill Attached list of Radio Station; A64 Distribution of Draft List A; A65 Correspondence between Peter Garrison, NY Commissioner of Planning & Stewart K. Wright, Tocks Island Study Officer; A66 Correspondence between Stewart Wright and Mr. John C. Bryson, Commissioner, Department of Natural Resources & Environmental Control, D....
Dates: Other: 1975

A84-91, 1971 - 1975

 File — Box: 2, Folder: 2
Scope and Contents A84 Evidence & Testimony Statement of Thomas Iezzi Sanitary Engineers for inclusion in the record of Oct 29th 1971 Hearing on the proposed Tocks Island Reservoir Project by the Joint Legislative Air and Water Pollution Control and Conservation Committee at Stroudsburg PA; A85 Report #13 Comprehensive Report; A86 Samuel W Morris, State Representative Letter of Opposition to the Tocks Island Reservoir Project; A87 Letter Comment “Cut off” date for Comprehensive Review study from Raymond...
Dates: Other: 1971 - 1975

B1, B3-6, B7a, 1974 - 1975

 File — Box: 2, Folder: 3
Scope and Contents B1 Letter from Corps of Engineer to URS/Madigan, Notice to Proceed with contract; B2 Missing; B3 Work Sequence Diagram (1/75) for Tocks Island Study by URS/Madigan – Praeger; B4 Copy of letter to Corps of Engineers (H. Howard) from URS/Madigan – Praeger, (R. Tillman) ; Memorandum of Meeting, Memorandum of Meeting, Study Design, document by consultant interpreting responsibilities under study contract; B5 Copy of Memorandum of meetings from offices of URS/Madigan – Praeger, Inc Attachments...
Dates: Other: 1974 - 1975

B8-15, 1974 - 1975

 File — Box: 2, Folder: 4
Scope and Contents B8 Revised Draft XVI. B.3 Comparative Evaluation of costs and related Economic Data for TILP and Alternative Programs Executive Summary – A Comprehensive Study of the Tocks Island Lake Project and Alternative; B9 Letter of Revised Proposal Re: Comprehensive Review Study of Tocks Island Lake Project and Alternatives Attached: Contract Addenda: Estimated Effort by Major tasks: Pricing Proposal (Contract); B10 Letters btw Tillman & Daniel Greenbaum Re: Comprehensive Review Study of Tocks...
Dates: Other: 1974 - 1975

B16-19, B21, 1974 - 1975

 File — Box: 2, Folder: 5
Scope and Contents B16 Public Information Tocks Island Study by consultant (URS/Madigan – Praeger, Inc); Memorandum of the Meeting with consultants above and study management team; B17 Progress: Report Feb 10-21 Comprehensive Review Study of Tocks Island Lake Project and Alternatives. Attached memoranda of Study Management Team meeting Summary of Major element; B18 Request for Study Management Team meet for March 6th at 1pm; B19 Contract between the Corps of Engineers and consultants URS/Madigan – Praeger,...
Dates: Other: 1974 - 1975

B20, Jan. 1976

 File — Box: 2, Folder: 6
Scope and Contents

B20 DRBC, “Time Variable Water Quality Analyses and Related Studies of the Upper Delaware River Port Jervis to Trenton,” prepared by Hydroscience

Dates: Other: Jan. 1976