B16-19, B21, 1974 - 1975
Scope and Contents
B16 Public Information Tocks Island Study by consultant (URS/Madigan – Praeger, Inc); Memorandum of the Meeting with consultants above and study management team; B17 Progress: Report Feb 10-21 Comprehensive Review Study of Tocks Island Lake Project and Alternatives. Attached memoranda of Study Management Team meeting Summary of Major element; B18 Request for Study Management Team meet for March 6th at 1pm; B19 Contract between the Corps of Engineers and consultants URS/Madigan – Praeger, Inc., and Conklin Rossant; B21 Cover letter to participants, Tocks Island Lake Review enclosing Review Draft Page A; copy of letter from consultant ( R. Tillman) to Corps of Engineers (H. Howard) with attached Progress Report for March 10-21 period
Dates
- Other: 1974 - 1975
Extent
From the Collection: 10 Linear Feet (Half boxes and bound volumes)
Language of Materials
From the Collection: English
Repository Details
Part of the University Archives Repository
East Stroudsburg University
200 Prospect Street
Kemp Library
East Stroudsburg PA 18301
570-422-3594
klibrary@esu.edu