B26-32, B34-35, 1975
Scope and Contents
B26 To Herbert Howard, Army Corps of Engineers from Thomas C Hunter Jr. Contracting Officer Army Corps of Engineers. Subject: Designation of Authorized Representative of Contracting Officer under Contract No. DACW51-75-C- 0026, Comprehensive Review and Analysis of the Tocks Island Lake Project; B27 Modification No. P00001 and letter from Corps of Engineers (T. Hunter) to consultants making reference to fee proposals and authorization to proceed with the required service; B28 Covering letter to participants from Herbert Howard enclosing Review drafts of parts C and E; copies of progress report – Memo summarizing Study Management Team; B29 Public opinion survey with covering letter to DRBC (S. K. Wright ) from consultant (R. Tillman); B30 Graphic display of Tocks Island Alternatives present by consultants at Public Information Meeting; B31 Memorandum of Study Management Team meeting from Offices of URS/Madigan-Praeger Inc; B32 Memo of Study Management Team Meeting: A letter Concerning Salinity investigations From Dept of Army Herbert Howard correspondence w/ Raymond Tillman of Madigan- Praeger Inc; B34 Progress Report June 2nd -13th Comprehensive Review Study of Tocks Island Lake Project & Alternatives Attach Memorandum Study Team Meeting; B35a Letter from Frances Beinecke, President of the Natural Resources Defense Council to Raymond Tillman, Consultant URS/Madigan-Praeger; B35B Draft Summary by Herbert Howard to Brigadier General James L Kelly, Division Engineer – North Atlantic Division – Corps of Engineers
Dates
- Other: 1975
Extent
From the Collection: 10 Linear Feet (Half boxes and bound volumes)
Language of Materials
From the Collection: English
Repository Details
Part of the Archives and Special Collections Repository
East Stroudsburg University
200 Prospect Street
Kemp Library
East Stroudsburg PA 18301
570-422-3594
klibrary@esu.edu